Explanation: Capitals indicate matter added to existing law.
[Brackets] indicate matter deleted from existing law.
* Warning: This is an unofficial, introductory copy of the bill.
The official copy considered by the City Council is the first reader copy.
DLR Draft III 09Aug23 DLR Draft III 09Aug23
Introductory*
City of Baltimore
Council Bill
Introduced by: Councilmembers Costello, Mosby, Middleton, Stokes, Torrence, Conway
A Bill Entitled
An Ordinance concerning
title
Public Service Agencies - Gas Metering and Regulation Equipment - Required Permits
For the purpose of requiring certain public service agencies to obtain a certain permit before installing gas metering or regulating equipment on certain real property; specifying documents to be submitted with a permit application; requiring a public service agency to obtain a property owner’s consent before a certain permit can be issued; establishing certain exceptions to these requirements; and generally relating to public utilities and permits to install gas metering and regulation equipment.
body
By adding
Article - Building, Fire, and Related Codes
Section 2-103 (IBC §§ 105.1(8), 105.14, and 2903.3.1)
Baltimore City Revised Code
(2020 Edition)
By repealing and reordaining, with amendments
Article - Building, Fire, and Related Codes
Section 2-103 (IBC §§ 105.2.2)
Baltimore City Revised Code
(2020 Edition)
By repealing and reordaining, with amendments
Article - Building, Fire, and Related Codes
Section 2-103 (IBC §§ 2903.1 to 2903.3)
Baltimore City Revised Code
(2020 Edition)
By repealing and reordaining, with amendments
Article - Building, Fire, and Related Codes
Sections 2-...
Click here for full text